- makes it possible the alignment of the handrails
- boltable dowel-connections without
- annoying tension of the elements
Assembly
- The holes are pre-drilled with a 13mm wood drill on the front side (both sides).
- The metal sleeve is screwed into one side as far as possible with a bus key, so that the metal surface ends with the cut surface of the handrail.
- The counterpart is screwed in with a special bolt (screw-in height).
- Then the two hand steps are screwed together to the zero point.
- Now the handles can be turned a maximum of one turn further.
- establish best position and rework easily if neccesary.
Haben Sie Fragen? Vielleicht finden Sie schon hier die passende Antwort.
» zu unseren FAQs